Solar & Battery Storage Development

Don't buy panels, get paid instead.

You're sitting on an asset that earns you nothing, we'd like to change that. Earn rent on non-utilized rooftops, fields or parking lots — we can help you extract the maximum amount of value possible.

And if you are a business that spends real money on power, we can help you save money and/or hedge your energy expenses for the next 35 years so that energy cost fluctuations stop affecting your bottom line. Flexible terms, white glove service and not a dime out of your pocket. Say yes to free money.

The Quieter Tax

There is a quieter tax as well.

Ask an EPC how large your system should be and he will size it to his contract. Ask a consultant and he will size it to his commission. Every panel he can bolt to your roof is a panel he is paid for, whether or not the building can use the power. The system is built to the ceiling of the incentive, not to the return.

Phæthon has no one in between. Development, engineering, construction, financing and asset management are done in-house, by one team, with one signature across the table. The same banks, the same tax-equity buyers, none of the toll-keepers. And because we build what we develop, we size the system to the return on the roof, not to the invoice.

Fewer hands, lower cost, more of the third left in the building. It is not complicated. Nothing that makes money ever is.

What We Do

One firm develops, structures and finances the project. That is where the margin comes from.

The industry has more people arranging introductions than building anything. The introducer is paid at signing and gone by the time the interconnection study comes back wrong. Phæthon develops the project, owns it and finances it; an affiliated EPC builds it on open-book terms. We are still on the letterhead in year twenty, which is the year the CFO discovers who is actually responsible for the roof.

I.

Develop

Site control, interconnection, permitting, the study process. The unglamorous work that decides whether a project is real, done in-house, at our expense and our risk.

II.

Structure

Power purchase agreements, site leases and federal tax credit structures drafted at the table, not sent out by the hour. Transactional and tax depth is the native language here, not a subcontract.

III.

Deliver

Engineering, construction and interconnection carried through to commercial operation by our affiliated EPC, open book, on our watch, and stood behind afterward. Because the builder answers to us rather than to his contract size, the system is sized for the return on the roof, not for the invoice. The signature on the lease is the signature on the outcome.

Where You Come In

Every project begins with one of four people.

The owner of land

Open acreage near a substation is the scarcest input in this business. We lease it for community solar, utility-scale solar and standalone storage on long terms at fixed rent, with every study and approval at our cost, and no obligation on you to consume a single kilowatt-hour.

For landowners →

The owner of a commercial or industrial building

Your roof is the one part of the building that earns nothing, and the lease is the reason it stays that way. We pay rent for the roof and the parking field; your tenants buy the power separately, or not at all. Neither of you funds anything.

For commercial & industrial landlords →

The owner of apartments

Electricity is one of the few lines in a multifamily operating statement that can be cut permanently. Cut it by a dollar and net operating income rises by a dollar; capitalise that and the asset is worth twenty more. Carports usually do it better than the roof.

For multifamily owners →

The business that buys power

Industrial, retail, manufacturing, agricultural and government users pay tariffs that rise on someone else's schedule. A power purchase agreement, at a fixed price or a guaranteed discount to the tariff, turns that exposure into savings. No capital outlay, no operating burden, no oversized system built to somebody's commission.

For businesses →

The Name

The sun's chariot demands a steady hand.

Ovid, in the second book of the Metamorphoses, tells us how Phæthon, wanting proof that the sun was his father, extracted an oath and asked for the one thing Helios begged him not to take: the reins to the chariot of the sun. The horses knew a lighter hand within a furlong. By midmorning Libya was desert, the Nile had fled to its source, and Jupiter ended the experiment with a thunderbolt over the Eridanus. His sisters wept amber. It is the oldest cautionary tale in the energy business: harnessing the sun is not the hard part. Keeping control of the enterprise is. We named the firm after the industry's favorite failure mode so we would never forget to avoid it.

Read the Phæthon model

Sebastiano Ricci, The Fall of Phæthon, c. 1703–04

Start a Conversation

A parcel, a rooftop or a utility bill is all we need to give you a straight answer.

Contact Phæthon